Knowde Enhanced TDS
Identification & Functionality
- Agrochemical Functions
- Technologies
Applications & Uses
- Markets
- Applications
- Applications
AminoA Plus Bags User Guide for Farmers and Professional Growers
Crops Time of Application Max. Dose Rates per ApplicationVegetables From transplanting to harvest, every 7 days 4.0 kg/ha Fruits/Orchards At start of budding (March) During blossom (April May) At fruit formation (July) During vernalisation (September October) 5.0 kg/ha Flowers During early development and before flowering 4.0 kg/ha Vineyards Start spraying when shoots are a round 10 cm long. At start of budding (Ma rch) During blossom (April May) At fruit formation (July) 5.0 kg/ha Cereals From early tillering to end of stem extension. 4.0 kg/ha Maize From early establishment stage to end of flowering 4.0 kg/ha Oilseed Rape From emergence to end of flowering 4.0 kg/ha Sugar Beet From GS12, 2 leaves to G$33 canopy closure. 4.0 kg/ha Potatoes From tuber initia tion then every 14 days as required 4.0 kg/ha - Suggested Growing Programmes
-
High Yield
- 0.5 kg x 1 Autumn (With Insecticide late October /Early November before growth stops).
- 1.5 Kg x 1 (As soon as growth starts in the spring).
- 1.5kg x 1 (GS 30) By itself or in mixture with Fungicide/ trace elements ( Warning do not tank mix more than 0.5 kg ha with growth regulators or herbicides that work by disrupting amino-acid chain ( Granstar etc) and use only the lowest dose of growth regulator or herbicide in the mixture especially with short strawed varieties of Wheat). Higher doses should be applied minimum of 4 days before or after other treatments.
- 1.5kg x1 (GS 39) By itself or in mixture with Fungicide/ trace elements
Average Yield
- 0.5 kg x 1 Autumn (With Insecticide late October /Early November before growth stops).
- 1 Kg x 1 (As soon as growth starts in the spring).
- 1kg x 1 (GS 30) By itself or in mixture with Fungicide/ trace elements ( Warning do not tank mix more than 0.5 kg ha with growth regulators or herbicides that work by disrupting amino-acid chain ( Granstar etc) and use only the lowest dose of growth regulator or herbicide in the mixture especially with short strawed varieties of Wheat). Higher doses should be applied minimum of 4 days before or after other treatments.
- 1kg x1 (GS 39) By itself or in mixture with Fungicide/ trace elements.
Maintenance
- 0.5 kg ha with every application to the crop.
- Stress Management (After frost event, drought) 2-3 kg x 1
High Yield
- 0.5 kg x 1 After emergence with insecticide.
- 0.5 kg x 1 With Autumn Fungicide.
- 1kg x1 As soon as growth starts in Spring.
- 1.5 kg x 1 (stem extension with insecticide).
- 1.5kg x1 (Green Bud).
- 1kg x1 (Full Flowering).
Average Yield
- 0.5 kg x 1 After emergence with insecticide.
- 0.5 kg x 1 With Autumn Fungicide.
- 1kg x1 As soon as growth starts in Spring.
- 1.5 kg x 1 (stem extension with insecticide).
- 1kg x1 (Green Bud).
Maintenance
- 0.5kg with every pass through the crop.
- Stress Management (After frost event, drought) 2-3 kg x 1
High Yield
- 2kg x 1 (stem extension with insecticide).
- 2kg x1(Green Bud).
- 1kg x1 (Full Flowering).
Average Yield
- 1.5 kg x 1 (stem extension with insecticide).
- 1kg x1(Green Bud).
- 1kg x1 (Full Flowering).
Maintenance
- 0.5kg with every pass through the crop
- Stress Management (After frost event, drought) 2-3 kg x 1
High Yield
- 1kg x 1 ( GS 19)
- 2kg x 1 (GS 30)
- 1.5kg x1 (GS 39)
Average Yield
- 1kg x 1 (GS19)
- 1.5kg x 1 (GS 30)
- 0.5kg x 1 ( GS 39)
Maintenance
- 0.5kg with every pass through the crop.
- Stress Management (After frost event, drought) 2-3 kg x 1
High Yield
- 2.5kg x 1 (5 True Leaves aprox 14 days after emergence).
- 2.5kg x1 (Latest possible application 16 True Leaves or more).
Average Yield
- 1.5kg x 1 (5 True Leaves aprox 14 days after emergence).
- 1.5kg x1 (Latest possible application 16 True Leaves or more).
Maintenance
- 0.5 kg with every pass through the crop.
- Stress Management (After frost event, drought) 2-3 kg x 1
High Yield
- 5 x 2 kg ha (total dose 10 Kg ha) timing aprox every two weeks starting with first fungicide before rows meet.
Average Yield
- 5 x 1 kg ha (total dose 5 Kg ha) timing aprox every two weeks starting with first fungicide before rows meet.
Maintenance
- 0.5 x 1 kg ha (total dose 2.5 Kg ha) timing aprox every two weeks starting with first fungicide before rows meet.
- Stress Management (After frost event, drought) 3 kg x 1
High Yield
- 3.5 kg ha x 3 (First application aprox 60 days after sowing following applications at 21 day intervals).
Average Yield
- 2 kg ha x 3 (First application aprox 60 days after sowing following applications at 21 day intervals).
Maintenance
- 0.5kg ha x 3 (First application aprox 60 days after sowing following applications at 21 day intervals).
- Stress Management (After frost event, drought) 3 kg ha x 1
- New plantations from Crowns. Dip Crowns in AminoA Plus solution ( 5kg per 100 liters water) at planting.
- Subsequent management and Established Plantations.
- Apply to fern from June onwards every 3 weeks 2.5 kg ha up to 4 applications.
- August – September 2.5-3.5 kg/ha.
- Autumn 2.5 -3.5 kg/ha.
- Spring at first growth 2.5-3.5 kg/ha.
- Before flowering 2.3-3.5 kg/ha.( NB in varieties that flower vigorously and unirrigated crops delay treatment until flowering has completed or you will have too many small fruits).
- Frost protection. Apply 3.5 kg/ha in 1000 liters water ha if possible on the evening before an expected frost.
- Apply 2.50 kg/ha from 3rd leaf stage every 15 days 3 to 5 applications.
- Vegetable Plugs.
- Dip plugs in solution prior to planting out 5 kg AminoA Plus /100 liters of water.
Packaging & Availability