company tower banner
Firestone Building Products Company Logo

FullForce™ EPDM

1 of 1 products in this brand
FullForce™ EPDM with Secure BondTM Technology is the next generation of self adhered roof system application. Secure Bond Adhesive is factory applied which ensures uniform adhesion across the entire membrane, even through the seam, creating a powerful bond with the substrate and overlapping seam area. This advanced technology not only improves installation speed over traditional fully adhered applications, but also widens the installation window with the ability to be installed from 20 °F (-7 °C) to 120 °F (49 °C). With no VOCs emitted during field membrane application, FullForce EPDM with Secure Bond Technology is a reliable solution for all your fully adhered roofing needs.

Polymer Name: Ethylene Propylene Diene Terpolymer (EPDM)

Physical Form: Sheets

Features: Good Weather Stability, Low Odor, Low VOC

Color: Transparent

Technical Data Sheet
  • TypeDocument Name
View All Documents

Knowde Enhanced TDS

Identification & Functionality

Technologies

Features & Benefits

Applications & Uses

Method of Application

Approved substrates to receive FullForce EPDM membrane must be clean, dry and free of foreign material such as grease and any debris which could inhibit adhesion. This may require cleaning with a broom or blower. An acceptable Firestone Primer is required to prepare surfaces for seaming, detailing, sealant application and vertical flashings, but no bonding adhesives are required for field membrane attachment.

  • Prepare substrate and secure insulation per current Firestone technical specifications.
  • Install FullForce EPDM membrane only when membrane, substrate and ambient temperatures exceed 20 °F (-7 °C) and rising. Do not install FullForce EPDM membrane below this minimum temperature.
  • Unroll and position the membrane over the substrate to achieve the specified alignment and seam overlaps. Allow the membrane to relax a minimum of 30 minutes before final positioning and adhering.
  • Position adjoining sheets in shingle fashion or so that seams run parallel to the flow of water, and that all side and end laps provide a minimum 3" (76.2 mm) overlap.
  • Apply an acceptable Firestone Primer (QuickPrimeTM Plus, QuickPrime Plus LVOC, Single-Ply QuickPrime Primer or Single-Ply LVOC Primer) to all EPDM lap surface areas to receive FullForce EPDM.
  • All membrane and flashing splices require the application of seam edge treatment using FullForce Sealant.
  •  Apply an acceptable Firestone Primer (as noted above) on all vertical substrates to receive FullForce EPDM membrane.

Properties

Physical Form
Typical Properties
ValueUnitsTest Method / Conditions
Thicknessmin. 0.060 +.009/-.006inD 412
Tensile Strength,min. 1450psiD 412
Dynamic Puncture ResistancePassD 5635
Static Puncture ResistancePassD 5602
Elongation, Ultimatemin. 475%D 412
Tensile Setmax. 2.0%D 2412
Tear Resistancemin. 195lbf/inD 624
Brittleness Pointmax. -49°FD 2137
Ozone Resistance, No CracksPassD1149
Tensile Strength (Heat Aging)min. 1490D 412
Water Absorptionmax. +1.5%D 471
Elongation, Ultimate (Heat Aging)min. 320D412
Tear Resistance (Heat Aging)min. 179lbf/inD 624
Linear Dimensional Change (Heat Aging)max. -0.3D 1204
PRFSE (Weather Resistance)min. 53G 151/D 412
Elongation, Ultimate (Weather Resistance)min. 200Die C

Storage & Handling

Storage
  • Warehouse membrane in a clean dry location.
  • FullForce EPDM membrane stored on jobsite must be kept dry.
  • FullForce EPDM membrane must be a minimum of 20 °F (-7 °C) prior to installation.
  • Store away from sources of punctures and physical damage.
  • Make certain the structural decking will support the loads incurred by material when stored on rooftop. The deck load limitations should be specified by the project designer.
  • Store away from ignition sources.
Shelf Life

18 Months when stored between 60 °F (16 °C) and 80 °F (27 °C) out of direct sunlight.