company tower banner
NSP Specialty Products Company Logo

NSP Specialty Products 107 - 100% Solids Primer

NSP 107 - 100% Solids Primer is used to promote the adhesion of 900XT Flake Filled High Performance Novolac. Designed to prevent abrasive blasted steel from developing rust bloom prior to the application of the topcoat. For maximum performance from your coating system, this primer should be used on steel in immersion service. All concrete surfaces should be primed regardless of intended service.

Product Type: 2K (2 component) Coating, Primer, Solventless & High Solids Coating

Compatible Substrates & Surfaces: Concrete, Metal, Steel

Features: Corrosion Resistant, Improved Adhesion, Low Odor, Moisture Resistant

Application Method: Spray

Technical Data Sheet
  • TypeDocument Name
View All Documents

Knowde Enhanced TDS

Identification & Functionality

Type

Modified Epoxy Resin/Proprietary Blend Hardener.

Features & Benefits

Product Features

Meets all VOC Requirements, Low Odor, User Friendly Application, Moisture Tolerant.

Applications & Uses

Application Method
Compatible Substrates & Surfaces
Intended Uses
  • 100% Solids Primer for Novolac coating system and urethane topcoats.
  • For use on horizontal or vertical steel and concrete surfaces.
Pot Life & Application Temperature

Pot life will depend on temperature. To prevent waste and avoid damage to equipment, do not mix more Material that can be used according to the table below.

TEMPERATURE POT LIFE
50ºF 90 min.
75ºF 60 min.
90ºF 30 min.

Application Temperatures: Substrate temperatures for both concrete and steel substrates must be between 50-100F. Relative humidity must not exceed 90%

Temperature Minimum Recoat Time

Maximum Recoat Time

50 °F 12 hrs 8 Days
75 °F 6 - 8 hrs 5 Days
90 °F 4 - 5 hrs 3 Days

 

Limitations
  • This product may not cure properly in temperatures below 50 F (10 C) Application of epoxy coatings in cool temperatures and high humidity can result in the formation of amine blush. Blush may appear as a milky, oily, white, tacky residue on the surface of the cured coating and must be removed before the application of another coat. Inter coat adhesion problems may occur if blush is not removed with warm water and detergent.
  • Remove all residue and dry prior to application of next coat.
Surface Preparation & Application

Surface Preparation

Limitations: This product may not cure properly in temperatures below 50 F (10 C) Application of epoxy coatings in cool temperatures and high humidity can result in the formation of amine blush. Blush may appear as a milky, oily, white, tacky residue on the surface of the cured coating and must be removed before the application of another coat. Inter coat adhesion problems may occur if blush is not removed with warm water and detergent. Remove all residue and dry prior to application of next coat. New Concrete – Concrete must be properly cured for a minimum of 28 days before application of coating. Surface must be entirely free of oil, grease, dirt, detergent, surface water, laitance, curing compounds, coatings or other contaminants that may interfere with adhesion. The concrete must be abrasive blasted to provide an anchor pattern (similar to 60-80 grit sandpaper min.) for adhesion. Final prepared surface should be clean and rough. Consult SSPC-SP13 – Surface Preparation of Concrete. Old Concrete - Surface must be entirely free of oil, grease, dirt, detergent, surface water, laitance, curing compounds, coatings or other contaminants that may interfere with adhesion. The concrete must be abrasive blasted to provide an anchor pattern (similar to 60-80 grit sandpaper min.) for adhesion. Final prepared surface should be clean and rough. Consult SSPC-SP13 – Surface Preparation of Concrete. Do not use NSP 100 as a primer over tightly adhered old coatings. Steel: - Immersion and heavy spillage service: SSPC SP-5 White Metal Blast with minimum of 2.0-3.0 mil profile – Atmospheric service – SSPC SP-6 Commercial Blast with 2.0 minimum profile

Mixing Instructions

This is a two-component system. Complete unit must be mixed and applied at one time. Do not mix partial quantities from containers or proper component ratios may not be obtained. Prior to mixing, components a resin and b hardener should be at room temperature (60-75 f/16-24c). Pour part b hardener into part a resin. Mix for 3 minutes using a jiffy mixer head and a mechanical drill. To ensure complete mixing, scrape sides and bottom of container and continue mixing for an additional minute. Do not hand mix. Begin application immediately – no induction time.
Mixed Ratio - 1 Part A (Resin)1 Part B (Hardener) by volume.

Application

Recommended Spread Rate: Concrete: 150-200 sq/ft/gal Steel: 250-300 sq/ft/gal. Actual dry film thickness may vary due to the porosity of the concrete. Thinner: Do not thin Packaging: Pre-measured 1 gallon and 5 gallon kits Air and surface temperature should be between 50-100 Deg. F. Do not begin application if air, substrate or material temperature is below 50 F/10C or expected to fall below 50F/10C within 12 hours of application. Do not begin application if dew point is within 5F/3C of the temperature. Variations in temperature can affect pot life of this material. Clean up using Acetone or other Ketone Solvent. Application in direct sunlight may lead to blistering or pinholes due to outgassing of air in concrete. Double priming, shading or evening application may be required. To optimize intercoat adhesion, application of base coat while primer is tacky is recommended.

Method of Application: 3/8” nap, phenolic core roller or Airless Spray

Properties

Physical Properties
ValueUnitsTest Method / Conditions
ComponentsTwo
Volume Solids100.0%
Tensile Strength2,000 - 2,500PSIASTM C-307
Tensile Elongation20 - 25%ASTM C-307
Adhesion to ConcreteCohesive Failure of concreteASTM D-4541
Adhesion to Steel2,200 - 2,500PSIASTM D-4541

Safety & Health

Warning & Safety
  • For industrial use only – keep away from children – flammable liquid.
  • Use only with adequate ventilation and avoid breathing mist or vapors. Prevent contact with skin and eyes with protective clothing/impervious gloves and goggles.
  • Do not take internally. Wash thoroughly after handling.

Storage & Handling

Storage & Shelf Life
  • Flammable liquid – keep away from heat, flame and possible ignition sources. Shelf life is 12 months from the date of manufacture when stored in unopened containers and under recommended conditions. Material should be stored in a dry area under cover at temperatures between 45-95f/7-35c.
  • It is recommended that the coating components be kept inside at a minimum of 60f/16c for 24 hours prior to start of application.
  • Do not let product freeze.