Knowde Enhanced TDS
Identification & Functionality
- Technologies
- Product Families
Features & Benefits
- Labeling Claims
- Ready-to-Use Product Features
- Characteristics
- Specifically formulated to deeply penetrate concrete substrates.
- Promotes tenacious adhesion of Sauereisen protective systems.
- Easy to apply - brush or roll.
- Water-borne - no noxious or toxic odors during application.
- VOC compliant.
Applications & Uses
- Markets
- Compatible Substrates & Surfaces
- Cure Method
- Area Preparation
Temperature of Working Area
- Maintain a temperature of 60°- 85°F on air, substrate, Liquid, and Hardener components during mixing, application, and cure. The material components should be maintained at 65°F to 85°F for 48 hours prior to beginning work.
- At temperatures below 65°F, the application becomes more difficult and curing is retarded. Above 80°F, the material working time decreases.
- Application in direct sunlight and rising surface temperatures may result in blistering of materials due to expansion of entrapped air or moisture in the substrate. Concrete that has been in direct sunlight must be shaded 24 hours prior to application and remain shaded until after the initial set. When the surface temperatures are rising, it may be necessary to postpone the application or apply during cooler hours.
Surface Preparation
- New Concrete - All structures must have the necessary strength to withstand imposed loads during normal use and operation. Surfaces should be floated free of ridges or depressions and all voids filled with Sauereisen Underlayment No. F-120 or Filler Compound No. 209. The choice of underlayment will depend on the severity of the voids to be filled. Surfaces should be sloped 1/8 to 1/4 inch per foot for drainage. If No. 209 is the material of choice, it must be applied AFTER PenePrime No. 500.
- Substrates must be free of oil, grease, and other contaminants that may inhibit bond. This can be achieved by chemical cleaning. Abrasive blast, high-pressure water blast, or acid etch concrete to remove laitance and to obtain a uniform surface texture exposing fine aggregate resembling coarse sandpaper.
- Old Concrete - Concrete must be dry, firm and must have the necessary strength to withstand imposed loads during normal use and operation. Mechanical methods should be utilized to remove laitance, old paints, protective coatings, and attacked or deteriorated concrete. Surfaces must be free of oil, grease, and other contaminants that may inhibit bond. This can be achieved by chemical cleaning. Abrasive blast, high-pressure water blast, or acid etch concrete to obtain a uniform, sound substrate. All structural cracks should be repaired and all slopes should be reestablished with Sauereisen Underlayment No. F-120.
- Brick - Surfaces must be free of oil, grease, and other contaminants that may inhibit bond. This can be achieved by chemical cleaning. Abrasive blast or high pressure water blast all foreign particles and attacked or unsound mortar from the joints. Loose brickwork should be regrouted with appropriate Sauereisen mortar to ensure structural integrity. Mortar joints should be repointed to be flush with the face of the masonry units.
- If chemical cleaning is utilized to remove contaminants, substrate must be neutralized. If abrasive or high-pressure water blasting is used as the method of surface preparation, all sand and/or debris must be removed by thoroughly vacuuming the area with an industrial vacuum cleaner.
- If surfaces do not have desired conditions, repeat surface preparation procedures.
- Application
Mixing
- Primers are packaged in premeasured containers consisting of Hardener Part A, and Liquid Part B which must be mixed together before use. Remix the Part A and Part B before combining.
- Completely empty contents of Hardener Part A into Liquid Part B container. Using a slow speed 1/2 inch drill motor with a "Jiffy" type blade, mix thoroughly for three minutes until blended to uniform color. Primer is ready for use immediately after mixing.
Properties
- Physical Properties
Value | Units | Test Method / Conditions | |
Application Time (Working Time, 70°F) | 30.0 | minutes | - |
Application Time (Tack Free, 70°F) | 3.0 | hours | - |
Bond Strength to Concrete | Concrete Failure | - | ASTM D-4541 |
Components | 2 parts | - | - |
Thickness | 5 - 10 | mils | - |
Technical Details & Test Data
- Coverage
Product Coverage per Gallon
No. 500 200 ft² at 8mils - Setting/Curing
Primer must be allowed to cure at least three hours but not more than 24 hours prior to application of a Sauereisen epoxy system. If recoat time exceeds 24 hours, consult Sauereisen.
Safety & Health
- Clean-Up
All equipment should be cleaned with MEK before material cures. If removal is required after cure, consult Sauereisen for recommendations.
Packaging & Availability
- Packaging
PenePrime No. 500 is packaged in one gallon and three gallon units.
- 500G - One Gallon Unit
- Part A - Hardener 5.90 lbs. packaged in a one gallon metal can.
- Part B - Resin - 3.0 lbs. packaged in a one gallon metal can.
- 500 T (3-Gallon Unit)
- Part A - Hardener -17.80 lbs. packaged in a 3-1/2 gallon plastic pail
- Part B - Resin - 8.90. lbs. packaged in a two gallon plastic pail.
- 500G - One Gallon Unit
Storage & Handling
- Shelf Life
Sauereisen PenePrime No. 500 Liquid and Hardener have a shelf life of one (1) year when stored in unopened, tightly sealed containers in a dry location at 70°F. Do not freeze. If there is a doubt as to the quality of the materials, consult a Sauereisen representative.