company tower banner
Epoxytec Company Logo
CPP™ Gel™ is a two-component, high strength, extremely forgiving/tolerant, vertical and overhead, non-sag. fast set epoxy paste, packaged in a convenient 1-to-1 mix ratio to use as needed and restock. The Epoxytec CPP Gel provides a point-of-use application to save time and material. The material has a wide variety of applications and is often sought for concrete, steel, and other substrate repairs, filling, patching and as an adhesive. Epoxy-based material is a sealed and protective solution to combat corrosion.

Product Type: 2K (2 component) Adhesive, Epoxy Adhesive

Compatible Substrates & Surfaces: Concrete, Metal, Steel

Application Method: Gun, Trowel

Chemical Family: Epoxy & Epoxy Derivatives

Technical Data Sheet
  • TypeDocument Name
View All Documents

Knowde Enhanced TDS

Identification & Functionality

Features & Benefits

Features
  • 1:1 mix ratio (to use as needed)
  • Moisture tolerant (cures underwater)
  • Surface tolerant
  • Superior, ultra high adhesion
  • High build, superior hanging
  • No sag
  • Chemical resistant
  • Self-priming
  • High strength

Applications & Uses

Application Method
Compatible Substrates & Surfaces
Typical Uses
  • Segmental epoxy
  • Anchoring epoxy
  • Adhesive
  • Sealed patching filler
  • Concrete repair and protection
  • Chemical resistance
  • Ultra high moisture, wet solution
Film Thickness
  • CPP Gel can be applied as a single coat or multi-coat system.
  • It can be feather-edged from a low mil thicknes (almost transparent) to a high build barrier liner of 1.5" (inches) thick without sag.
Theoretical Coverage
  • CPP Gel is 100% solid and will not shrink.
  • Therefore, the theoretical coverage properties between wet film thickness (WFT) and dry film thickness (DFT) are the same.
  • Twenty-six (26) square feet (sq.ft.) per gallon (gal.) at 1/16 inch (62.5 mils) thick.
  • One gallon of neat CPP GelT yields 231 cu.in. of epoxy.
Application Method
  • CPP Gel must be applied by trowel or spatula.
  • Part A paste must be mix with Part B paste, recommended to do so on a mixing board, until both parts become one homogenous color.
  • CPP Gel is self-priming.

Adhesive:

  • Apply to both bonding surfaces with spatula, trowel, or caulking gun.
  • Join material.
  • If necessary, clamp until cured.
  • Strike off excess material.

Anchoring Bolts:

  • Vertical and overhead.
  • Partially fill drill hole with CPP GelT It is permissible for the hole to be damp (remove excess water), however, the bolt must be dry.
  • Work bolt in and out to compact the paste.
  • Secure with templates.
  • With bolt in position fill in the remaining void.

Repair Patching Filling:

  • Vertical and horizontal surfaces.
  • Apply to area with trowel, spatula, or caulking gun.
  • Work in at a maximum 1.5" per coat.
Thinning

CPP™ Gel™ Cannot be thinned.

Surface Preparation
  • The success of any coating application is directly proportional to the completeness of the substrate preparation and the care the application crew puts into the application.
  • Surface must be clean and sound.
  • Remove all dust, contaminants, grease curing compounds, rust, impregnation, waxes foreign particles, and disintegrated materials from the surface, in order to achieve a clean and profiled surface.

Concrete:

  • Prepare the concrete by abrasive blasting and/or high-pressure water cleaning and/or approved mechanical methods.

Wood:

  • Remove all loose particles, rot, and soft spots.
  • The area to be coated should be sanded and rinsed.
  • Allow time to dry thoroughly.

Steel:

  • Before preparing steel, please inspect and remove oil, grease, or other contaminants - "Solvent Cleaning" (SPC SP1) may be required.
  • Remove all sharp peaks, including weld spatter mechanical methods) must be used in order to achieve a clean surface with a minimum profile of 3 mils.
  • To prevent flash rusting, consider the use of an Epoxytec recommended primer.
Mixing
  • 1 Part "A" to 1 Part "B" Mix both parts together until a smooth consistent gray paste is formed without streaks or lumps.
  • This product must be applied within 30 - 40 minutes after mixing.
  • This time frame can be extended at lower temperatures and reduced at higher.
  • A heat lamp can be used to speed up the curing time if necessary.

Properties

Physical Form
Performance Properties
ValueUnitsTest Method / Conditions
Solids by Volume100.0%ASTM D2697
Adhesion Strength (Concrete)Substrate FailureASTM D4541
Tensile Bond to Wet Concrete525.0psi
Tensile Strength8500.0psiASTM D638
Diagonal Shear Strength6365.0psiASTM E519
Compressive Strength8320.0psiASTM D6995
Gel Time15.0minutes
Complete Cure3.0hours
Water Absorption0.2%
ConsistencyPaste (Thixotropic)
Epoxide Equivalent of Resin182.94
Material Operational Temperature75.0°F

Packaging & Availability

Packaging
  • 2 Gallon Kit (cans)
  • 1,500mL Dual Cartridges
  • 600mL Dual Cartridges

Storage & Handling

Pot Life (Mixed, 25°C, 200g Mass)
30 minutes
Shelf Life
  • Shelf life is five (5) years, sealed.
  • Store in room temperature or sheltered areas between 60°F and 80°F.