company tower banner
Epoxytec Company Logo

CPP™ Gel: Crack Injection

1 of 4 products in this brand
CPP™ Gel: Crack Injection is two-component moisture insensitive, highly adhesive, chemical resistant, 100% solids, high strength epoxy paste and reinforced structural-grade epoxy. Similar to “standard” CPP once cured, this version is packaged more conveniently for Crack Injection and repair by extrusion. Contains no solvents. CPP™ Gel: Crack Injection bonds to concrete, steel, wood, brick, some plastics and most construction materials. Application temperature range is between 40°F and 100°F.

Product Type: 2K (2 component) Adhesive, Epoxy Adhesive, Repair Adhesive

Compatible Substrates & Surfaces: Brick, Concrete, Stone, Wood

Application Method: Gun

Chemical Family: Epoxy & Epoxy Derivatives

Technical Data Sheet
  • TypeDocument Name
View All Documents

Knowde Enhanced TDS

Identification & Functionality

Features & Benefits

Features
  • Easily dispensable from most caulking guns.
  • Rapid initial set time (approx. 3 hrs) at room temperature (75°F).
  • Moisture is insensitive and may be used on damp surfaces (SSD).

Applications & Uses

Application Method
Compatible Substrates & Surfaces
Typical Uses
  • Ideal bonding agent for most materials including concrete, brick, wood, stone, block and other substrates
  • May be used as an adhesive or filler
  • Capping paste and injection port adhesive for crack injection process
  • Non-sag patching material for cracks and small spalls
  • Ideal for overhead and vertical repairs
Surface Preparation

Concrete:

  • Prepare the concrete by abrasive blasting, high-pressure water cleaning, and/or approved mechanical method to achieve clean, sound, and profiled concrete.
  • When logistics permit, prepare concrete in accordance with SSPC-SP 13/NACE No. 6. “Surface Preparation of Concrete.”

Steel:

  • Before preparing steel, please inspect and remove oil, grease, or other contaminants - “Solvent Cleaning” (SSPC-SP1) may be required.
  • Abrasive blasting (or other approved mechanical methods) must be used in order to achieve a clean surface with a minimum profile of 3 mils.
  • To prevent flash rusting, consider the use of an Epoxytec recommended holding primer.
Limitations
  • Use CPP gel crack injection for small spall repairs only.
  • A deeper or larger mass will generate excessive heat (with likely visible vapor), cracking and the material foaming / rising.

Properties

Physical Form
Typical Properties
ValueUnitsTest Method / Conditions
Gel Time (60g Mass)14.0minutesASTM C881
Tack Free Cure3.0hoursASTM D2371
Working Time30.0minutes
Compressive Strength (7 Days)6118.0psiASTM D695
Compressive Modulus (7 Days)105800.0psiASTM D695
Bond Strength (14 Days)1635.0psiASTM C882

Storage & Handling

Storage & Handling
  • Shelf life: 36 months, sealed
  • Storage: Store in a dry area away from direct sunlight
  • Storage Temperature: 40°F and 90°F